• 0 Posts
  • 12 Comments
Joined 1 year ago
cake
Cake day: June 10th, 2023

help-circle






  • Except in very rare configurations (i.e. not 99.9% of residential), you do not want to have multiple paths to ground within a system. All grounds should go to the tied ground/neutral bus in the main breaker panel, which then goes to earth via a ground rod or a clamp to a copper gas/water line, etc. Otherwise you can have current flowing in ways that the system isn’t designed for, which at the least can trip breakers and GFCIs, and at worst exceed the rating of the wires in a short condition and cause a fire.


  • Except in very rare configurations (i.e. not 99.9% of residential), you do not want to have multiple paths to ground within a system. All grounds should go to the tied ground/neutral bus in the main breaker panel, which then goes to earth via a ground rod or a clamp to a copper gas/water line, etc. Otherwise you can have current flowing in ways that the system isn’t designed for, which at the least can trip breakers and GFCIs, and at worst exceed the rating of the wires in a short condition and cause a fire.



  • At least for me, I have ADHD—if it’s out of sight (i.e. another bookmark in one of the hundreds of folders I have), it ceases to exist, no matter how important or interesting it is.

    I have 6 virtual desktops for current projects, with all of the tabs (and other applications) for each project on a desktop, and with a Firefox window for each “topic” within that project. I go through and close out old windows periodically (i.e. when I need to free up desktops), saving anything I might want to refer back to with the Tab Stash plugin. Importantly, I also have the Auto-Discard Tabs plugin so they aren’t using RAM until I need them again.

    It might seem messy, but it’s what works best for my brain. I do at least try to not have more than 12 tabs per window. On rare occasions I’m even successful! 🙃



  • Heads up from their website:

    Please note that VYVANSE and MYDAYIS will no longer be available through Help at Hand after December 31, 2023. The completed application with all required supporting documentation must be received and approved by October 16, 2023 in order to continue to receive product from the Help at Hand Patient Assistance Program for the remainder of 2023. Please work with your health care provider to determine the appropriate next steps to best address your individual needs. Enrollees with questions should call 1-800-830-9159.